Puerto Rico's landfill capacity crisis expires 2028–2030 — the Act 60 manufacturing pathway is the only structural solution that generates revenue La crisis de capacidad de vertederos de Puerto Rico vence en 2028–2030 — el camino manufacturero de la Ley 60 es la única solución estructural que genera ingresos

A structured overview of the Carbotura Circular Supply Agreement for Puerto Rico — Phase Initial 400 TPD through Phase Expanded 2,000 TPD Una visión estructurada del Acuerdo de Suministro Circular de Carbotura para Puerto Rico — Fase Inicial 400 TPD hasta Fase Expandida 2,000 TPD

400 TPD Phase Initial · Q1 2029 COD 2,000 TPD Phase Expanded EPA Consent Orders · 12 Closures 2025–2028 Territorial Capacity Exhaustion ~2030 $120/ton TMC Fee · Act 60 Manufacturing Decree ~$530M Annual System Cost · Rising
Carbotura Advanced Circular Manufacturing facility — illustrative configuration
Carbotura ACM Facility · Illustrative configuration Instalación ACM de Carbotura · Configuración ilustrativa
Programme Brief · DOC 04 OF 06

What this document isQué es este documento

A single-page summary: what Puerto Rico is being asked to authorise, what it receives, and the deadline that governs the timetable.El punto de entrada a los documentos del programa.

Three things this document saysTres cosas que dice este documento
  1. Puerto Rico is at a decision point: landfill capacity across the island is constrained and the replacement pathway is not contracted.Puerto Rico: la capacidad de vertedero en la isla está limitada y la vía de reemplazo no está contratada.
  2. Advanced Circular Manufacturing converts the residual stream into products under one agreement, with no counterparty capital committed.La Manufactura Circular Avanzada convierte el flujo residual en productos bajo un solo acuerdo, sin capital de la contraparte.
  3. The Beneficiation Fee and the Circular Royalty™ are independent transactions, reported separately and never netted against each other.La Tarifa de Beneficiación y el Canon Circular son transacciones independientes: se presentan por separado y nunca se compensan entre sí.
Looking for something else?¿Busca otra cosa?

12 landfills closing 2025–2028 — territorial capacity exhaustion projected ~2030 12 vertederos cerrando 2025–2028 — agotamiento de capacidad territorial proyectado ~2030

EPA Consent Orders · ActiveÓrdenes de Consentimiento EPA · Activas

Puerto Rico operates 29 municipal landfills, only 11 federally compliant. Twelve operate under EPA Consent Orders requiring closure, with the clustered closure window running 2025–2028. A FEMA/EPA assessment projects territorial landfill capacity exhaustion between 2028 and 2030. No contracted engineered alternative currently exists. DRNA's February 2026 public reconsideration of waste-to-energy incineration confirms the Commonwealth is actively searching without a solution in place. The window to authorize a 30-year contracted manufacturing pathway closes in Q3 2026 for Phase Initial COD Q1 2029 — just ahead of the capacity wall. Puerto Rico opera 29 vertederos municipales, solo 11 cumplen con normativas federales. Doce operan bajo Órdenes de Consentimiento EPA que requieren cierre, con una ventana de cierre en 2025–2028. Una evaluación FEMA/EPA proyecta el agotamiento de capacidad entre 2028 y 2030. No existe actualmente ninguna alternativa contratada.

Puerto Rico generates approximately 10,000 TPD of manufacturing feedstock against an annual system cost approaching $530 million — rising. The current system routes waste to a shrinking pool of compliant landfills with no contracted replacement. Carbotura's ACM process converts residual MSW into synthetic graphite, graphene compounds, and recovered minerals — anoxic, oxygen-free, no combustion, classified under manufacturing NAICS (not solid waste). Puerto Rico genera aproximadamente 10,000 TPD de materia prima manufacturera con un costo anual del sistema cercano a $530 millones — en aumento. El proceso MCR de Carbotura convierte el MSW residual en grafito sintético, compuestos de grafeno y minerales recuperados.

Manufacturing NAICS classification — the same classification that qualifies for Act 60 Chapter 6 Manufacturing Decree. This unlocks a 4% CIT, 75% property tax exemption, and 50% municipal license exemption — structural fiscal incentives that compound over the 30-year CSA term and are only available under manufacturing classification, not solid waste. La clasificación manufacturera NAICS — la misma clasificación que califica para el Decreto Manufacturero Capítulo 6 Ley 60. Esto desbloquea un 4% CIT, 75% de exención de impuesto a la propiedad y 50% de exención de licencia municipal.

Phase Initial at 400 TPD achieves COD Q1 2029 — just ahead of the projected capacity wall. Zero territorial capex. The Beneficiation Fee of $120/ton replaces previously committed disposal spending. From Month 13, the Circular Royalty™ at $144/ton returns 120% of the current-year Beneficiation Fee. La Fase Inicial de 400 TPD logra COD en Q1 2029, justo antes del muro de capacidad proyectado. Cero capex territorial.

Puerto Rico Deployment ScaleEscala de Implementación de Puerto Rico
Phase Initial400 TPD
COD Q1 2029 · ahead of capacity wallCOD Q1 2029 · antes del muro de capacidad
Phase Medium1,000 TPD
COD Q3 2030 · absorbs closing landfill streamsCOD Q3 2030 · absorbe los flujos de vertederos que cierran
Phase Expanded2,000 TPD
COD Q3 2031 · full territorial structural solutionCOD Q3 2031 · solución estructural territorial completa
Manufactured outputsProductos manufacturados
Synthetic graphite Graphene compounds Recovered minerals

Five structural facts for Puerto RicoCinco hechos estructurales para Puerto Rico

1
$530M annual system cost is rising — the capacity crisis is structural, not cyclical.El costo anual del sistema de $530M está aumentando — la crisis de capacidad es estructural, no cíclica.

Puerto Rico's landfill system cost approaches $530M annually — incorporating EPA-mandated closure provisioning, 30-year post-closure care, and the capacity-crisis forward curve premium. Against 10,000 TPD territorial generation, this cost rises each year. The Beneficiation Fee at $120/ton replaces this spend; the Circular Royalty™ from Year 2 returns more than was paid.El costo del sistema de vertederos de Puerto Rico se acerca a $530M anuales. El Beneficiation Fee de $120/ton reemplaza este gasto; el Circular Royalty™ desde el Año 2 devuelve más de lo pagado.

2
12 EPA Consent Order landfills closing 2025–2028 — each closure removes capacity with no contracted replacement.12 vertederos con Órdenes de Consentimiento EPA cerrando 2025–2028 — cada cierre elimina capacidad sin reemplazo contratado.

Each of the 12 Consent Order landfills closing in the 2025–2028 window increases pressure on the remaining compliant facilities. FEMA/EPA projects territorial capacity exhaustion 2028–2030. DRNA's February 2026 public reconsideration of incineration confirms there is no contracted alternative. Phase Initial COD Q1 2029 positions Puerto Rico ahead of this wall — but only if the procurement decision is made by Q3 2026.Cada uno de los 12 vertederos que cierran aumenta la presión sobre las instalaciones conformes restantes. La proyección FEMA/EPA es el agotamiento de capacidad 2028–2030.

3
Act 60 Chapter 6 Manufacturing Decree is only accessible under manufacturing NAICS — not solid waste.El Decreto Manufacturero Capítulo 6 Ley 60 solo es accesible bajo NAICS manufacturero — no residuos sólidos.

ACM's NAICS classification under Sector 31–33 (manufacturing) directly qualifies for Act 60 Chapter 6 Manufacturing Decree: 4% corporate income tax, 75% property tax exemption, 50% municipal license exemption. A solid waste classification (NAICS 562xxx) is a Regulatory Predicate Transition (RPT) failure — Carbotura will not execute the CSA if the facility is classified as solid waste disposal. The Act 60 incentives are a compounding value layer that only exists under the manufacturing pathway.La clasificación NAICS del ACM bajo el Sector 31–33 califica directamente para el Decreto Manufacturero Capítulo 6 Ley 60: 4% CIT, 75% exención de impuesto a la propiedad, 50% exención de licencia municipal.

4
El Circular Royalty™ supera el Beneficiation Fee desde el Año 2 — neto positivo sobre una base de $0 capex territorial.

Year 1 Beneficiation Fee at Phase Initial (400 TPD): $17.52M. Year 2 Circular Royalty™: $21.02M. Zero territorial capital expenditure throughout. Gross cost displacement quantified separately from the Circular Royalty™ per the Separate Transaction Principle.Año 1 Beneficiation Fee Fase Inicial: $17.52M. Año 2 Circular Royalty™: $21.02M. Excedente neto Año 2: ~+$3.07M. Cero gasto de capital territorial.

5
Phase Initial COD Q1 2029 is achievable — but only with a Q3 2026 procurement decision.COD Fase Inicial Q1 2029 es alcanzable — pero solo con una decisión de adquisición en Q3 2026.

Working backward from Q1 2029 COD: construction must begin Q1 2027, CSA must execute by Q2 2026, LOI/MOU execution must come by Q3 2026. Each step in the chain is dependent on the previous. The window is open now. Waiting for the capacity crisis to become acute forecloses the pre-crisis commissioning window permanently.Trabajando hacia atrás desde el COD Q1 2029: la construcción debe comenzar Q1 2027, el CSA debe ejecutarse en Q2 2026, la autorización del Estudio de Factibilidad debe llegar en Q3 2026.

Two paths for Puerto RicoDos caminos para Puerto Rico

Canon Circular™
Standard CSA
Circular Royalty™
Elección Estándar
Circular Royalty™
Beneficiation Fee replaces disposal spending; Circular Royalty™ begins Month 13 and escalates annually.El Beneficiation Fee reemplaza el gasto de disposición; el Circular Royalty™ comienza el Mes 13.
  • Beneficiation Fee: $120/ton, 2.5%/yr escalatorBeneficiation Fee: $120/ton, escalador 2.5%/año
  • Circular Royalty™: 120% of the current-year Beneficiation Fee (Year 1 base $144/ton), +1pp/yrCircular Royalty™: 120% de la base del Año 1 ($144/ton), +1pp/año
  • Royalty commencement: Month 13 after corresponding Beneficiation Fee payment (rolling monthly)Inicio de Royalty: Mes 13 tras el Beneficiation Fee correspondiente (mensual rotativo)
  • 30-year CSA term · perpetual continuation languageTérmino CSA 30 años · lenguaje de continuación perpetua
  • Parent Performance Guarantee · Zero territorial capexGarantía de Desempeño Matriz · Cero capex territorial
  • Regulatory Predicate Transition (RPT) — NAICS Sector 31–33 requiredRPT — NAICS Sector 31–33 requerido
  • Act 60 Chapter 6 Manufacturing Decree eligibility (4% CIT, 75% property tax, 50% municipal)Elegibilidad Decreto Manufacturero Ley 60 Cap. 6 (4% CIT, 75% impuesto propiedad, 50% municipal)
  • US GAAP / GASB accounting treatment
Bonus Feature · Available under the CSACaracterística Adicional · Disponible como complemento de la CSA
Exogenesis™ Royalty · Landfill CandidatesExogenesis™ Royalty · Candidatos a Vertedero

Puerto Rico's legacy and closing landfill sites — accumulated under the EPA Consent Order closure programme — are qualifying candidates for the Exogenesis™ Royalty. Converting accumulated legacy material into a structured dual-stream payment converts a post-closure liability into a royalty income stream without altering primary CSA terms. Available under the CSA. Subject to Waste Characterization Study confirmation.Los vertederos heredados y en proceso de cierre de Puerto Rico son candidatos elegibles para el Exogenesis™ Royalty. Convierte el material heredado acumulado en un pago de doble flujo estructurado. Disponible como complemento de la CSA.

Subject to Waste Characterization Study confirmationSujeto a confirmación del Estudio de Caracterización de Residuos

Key figures at a glanceCifras clave de un vistazo

Beneficiation Fee
$120
per ton · 2.5%/yr
Year 1 base · Phase Initial
por tonelada · 2.5%/año
base Año 1 · Fase Inicial
Circular Royalty™ · Yr 2
$21.0M
Fase Inicial 400 TPD
+$3.07M excedente vs. tarifa
System CostCosto del Sistema
~$530M
Annual territorial · rising
no contracted alternative
Anual territorial · en aumento
sin alternativa contratada
Act 60 BenefitBeneficio Ley 60
4%
CIT under Manufacturing Decree
75% property · 50% municipal
CIT bajo Decreto Manufacturero
75% propiedad · 50% municipal

Circular Royalty™ projections — 400 to 2,000 TPDProyecciones de Circular Royalty™ — 400 a 2,000 TPD

Beneficiation Fee and Circular Royalty™ shown independently per the Separate Transaction Principle.Beneficiation Fee y Circular Royalty™ mostrados de forma independiente según el Separate Transaction Principle.

CapacityAnnual TPYFee · Year 1Royalty™ · Year 230-Yr Gross RoyaltyFTE
400 TPD ← Phase Initial146,000$17.52M$21.02M~$1,049M EST~100
1,000 TPD · Phase Medium365,000$43.80M$52.56M~$2.62B EST~250
2,000 TPD · Phase Expanded730,000$87.60M$105.12M~$5.24B EST~500

All figures USD. Royalty (Year n) = (120% + (n−1)pp) × that year’s Beneficiation Fee ($144/ton). At steady state, the Circular Royalty™ is designed to exceed the Beneficiation Fee on a per-ton basis. Circular Royalty™ payments begin 13 months after corresponding Beneficiation Fee payments and ramp to full run-rate on a rolling basis. 30-year gross royalty ESTIMATED.Todas las cifras en USD. Royalty Año 2 = 120% × base Año 1 ($144/ton). El Circular Royalty™ está diseñado para exceder el Beneficiation Fee por tonelada en estado estable.

All financial figures USD. Beneficiation Fee $120/ton programme specification. Territorial MSW generation ~10,000 TPD per DRNA public reporting. Annual system cost ~$530M ESTIMATED incorporating closure provisioning, post-closure care, and forward curve premium. 12 Consent Order landfills closing 2025–2028 per EPA/DRNA enforcement records. Capacity exhaustion 2028–2030 per FEMA/EPA assessment. Act 60 Chapter 6 Manufacturing Decree eligibility subject to OITE determination. Exogenesis™ candidacy subject to Waste Characterization Study confirmation. Accounting standard: US GAAP / GASB. Gross cost displacement is quantified separately from Circular Royalty™ cash flow per the Separate Transaction Principle. This document is current as of May 2026. Todas las cifras en USD. Beneficiation Fee $120/ton especificación del programa. Generación territorial de MSW ~10,000 TPD. Costo anual del sistema ~$530M ESTIMADO. Exogenesis™ sujeto a confirmación del Estudio de Caracterización de Residuos. Norma contable: US GAAP / GASB. Este documento está actualizado a mayo de 2026.
Canonical Principles
  1. Carbotura is a manufacturer, not a waste manager. Advanced Circular Manufacturing converts delivered feedstock into products; it does not manage or dispose of waste.
  2. The Beneficiation Fee and the Circular Royalty™ are independent transactions. They are reported separately and in full, and are never netted against each other.
  3. Hydrogen powers the facility internally — it is generated and consumed on site to run the process, and is not sold as offtake.